粉料撒布車(chē)與冷再生拌和機(jī)的配套使用
來(lái)源:http:/// 日期:2021-08-11
(1)測(cè)量放樣。
(1) Survey and setting out.
測(cè)設(shè)中樁,直線段每20m設(shè)一樁,平曲線段每10m設(shè)一樁,并在兩側(cè)路肩邊緣外設(shè)指示樁,見(jiàn)圖2。在指示樁上用明顯標(biāo)記標(biāo)出水泥土邊緣的虛鋪高度。
Survey and set middle stakes. One stake is set every 20m in straight line section and one stake every 10m in flat curve section, and indicator stakes are set outside the edges of shoulders on both sides, as shown in Figure 2. Mark the virtual paving height of cement soil edge with obvious marks on the indicator pile.
(2)土方攤鋪。
(2) Earthwork paving.
原地面、水泥攪拌樁、砂礫換填驗(yàn)收合格后,恢復(fù)中樁和兩側(cè)邊樁,檢測(cè)基底高程,在基底上用石灰線畫(huà)出中線、邊線和布土方格(圖3)。根據(jù)實(shí)測(cè)虛鋪系數(shù)計(jì)算虛鋪厚度,壓實(shí)厚度按照20cm控制。根據(jù)運(yùn)土車(chē)大小,計(jì)算布土方格尺寸。
After the original ground, cement mixing pile and gravel replacement are accepted, restore the middle pile and side piles on both sides, detect the elevation of the base, and draw the center line, side line and soil distribution grid on the base with lime line (Fig. 3). The virtual paving thickness is calculated according to the measured virtual paving coefficient, and the compaction thickness is controlled as 20cm. Calculate the size of soil distribution grid according to the size of soil truck.
(3)整平。
(3) Leveling.
推土機(jī)粗平后做出標(biāo)高控制點(diǎn),然后用平地機(jī)精平,整理出路拱和橫坡,見(jiàn)圖4。整平后要及時(shí)檢測(cè)素土的含水量,按比最佳含水量高出2%控制。隨后檢測(cè)土的含水量是否均勻并符合要求,合格后進(jìn)入下道工序。當(dāng)含水量過(guò)低時(shí),采用水車(chē)補(bǔ)水調(diào)整。當(dāng)含水量大時(shí),需翻開(kāi)晾曬。
冷再生機(jī)租賃
Make elevation control points after rough leveling by bulldozer, and then fine level with grader to sort out outlet arch and cross slope, as shown in Figure 4. After leveling, the water content of plain soil shall be detected in time and controlled as 2% higher than the optimal water content. Then, check whether the water content of soil is uniform and meets the requirements, and enter the next process after it is qualified. When the water content is too low, the water truck shall be used for water replenishment adjustment. When the water content is large, open it for drying.
(4)撒布水泥。
(4) Spread cement.
采用粉料撒布車(chē)進(jìn)行水泥撒布,見(jiàn)圖5。撒布前需要根據(jù)水泥劑量計(jì)算出每平方米的水泥撒布量,然后只需駕駛員在車(chē)輛控制器中輸入每平方米的水泥撒布量和撒布寬度即可。輸入后,車(chē)輛控制系統(tǒng)自動(dòng)計(jì)算出相關(guān)參數(shù)并開(kāi)始均勻撒布。
The powder spreader is used for cement distribution, as shown in Figure 5. Before spreading, the cement spreading amount per square meter needs to be calculated according to the cement dose, and then the driver only needs to input the cement spreading amount and spreading width per square meter in the vehicle controller. After input, the vehicle control system automatically calculates relevant parameters and starts uniform distribution.
(5)拌和。
(5) Mixing.
水泥撒布完成后采用冷再生拌和機(jī)拌和,見(jiàn)圖6。從兩側(cè)向中間方向進(jìn)行拌和,拌和速度為1~3.3km/h,拌和次數(shù)不少于1次,直到翻拌均勻?yàn)橹?。翻拌過(guò)程中,應(yīng)安排人隨時(shí)檢查翻拌深度是否滿(mǎn)足要求。翻拌完成后檢查含水量,如果含水量滿(mǎn)足要求,混合料色澤均勻一致,沒(méi)有灰條、灰團(tuán)和花面,沒(méi)有粗細(xì)顆粒“窩或帶”就算拌和合格。同時(shí)采用EDTA滴定法快速測(cè)定水泥劑量。若水泥量不足,應(yīng)補(bǔ)撒水泥,重新滴定直至水泥劑量滿(mǎn)足大于等于4%的要求,然后重新拌和至符合要求。
After the cement distribution is completed, the cold recycling mixer is used for mixing, as shown in Figure 6. The mixing shall be carried out from both sides to the middle. The mixing speed shall be 1 ~ 3.3km/h, and the mixing times shall not be less than once until the mixing is uniform. During the mixing process, a person shall be arranged to check whether the mixing depth meets the requirements at any time. Check the water content after mixing. If the water content meets the requirements, the color of the mixture is uniform, there is no ash strip, ash mass and flower surface, and there is no "nest or belt" of coarse and fine particles, the mixing is qualified. At the same time, EDTA titration method is used to quickly determine the cement dose. If the amount of cement is insufficient, the cement shall be added, titrated again until the cement dose meets the requirements of greater than or equal to 4%, and then remixed to meet the requirements.
拌和過(guò)程中,及時(shí)檢查混合料的含水量。含水量宜略大于最佳含水量1~2個(gè)百分點(diǎn)。如果混合料的含水量不足,利用灑水車(chē)灑水潤(rùn)濕。
During mixing, check the water content of the mixture in time. The water content should be slightly greater than the optimum water content by 1 ~ 2 percentage points. If the water content of the mixture is insufficient, use the sprinkler to wet it.
(6)壓實(shí)。
(6) Compaction.
水泥土拌和均勻后,用壓路機(jī)立即在基面上快速碾壓一遍,以暴露潛在的不平整,見(jiàn)圖7。然后再用平地機(jī)精平一次。每次整平都按照精平要求進(jìn)行。需特別注意接縫處的整平,使接縫順適平整。
After the cement soil is mixed evenly, the road roller shall be used to quickly roll the foundation surface once to expose the potential unevenness, as shown in Figure 7. Then use the grader for fine leveling. Each leveling shall be carried out according to the requirements of fine leveling. Special attention shall be paid to the leveling of joints to make the joints smooth and flat.
好的產(chǎn)品成就好的服務(wù),好的企業(yè)成就好的產(chǎn)品,冷再生機(jī)租賃堅(jiān)持為客戶(hù)提供優(yōu)質(zhì)的服務(wù),詳情請(qǐng)繼續(xù)關(guān)注我們的網(wǎng)站:http://
Good products make good services, and good enterprises make good products. Cold regenerator leasing insists on providing customers with high-quality services. Please continue to pay attention to our website for details: http://
  • 上一條:全自動(dòng)粉料撒布車(chē)與冷再生機(jī)如何搭配提高質(zhì)量?
  • 下一條:冷再生機(jī)水穩(wěn)層施工要注意什么?
  • 相關(guān)新聞:

    沈阳市| 视色4se成人午夜精品| 国产一二区视频| 日韓丨亞洲丨制服丨亂倫| 国产美女高潮流白浆视频| 免费看片A级毛片免费看| 亚洲AV无码成人网站在线观看| 国产乱子伦无套一区二区三区 | 另类内射国产在线| 亚洲欧美日韩国产精品一区二区| 精品国产综合色在线| 免费无码又爽又刺激高潮视频 | 国产偷v国产偷v国产高清| av一道本| av最新网址| 国产美女精品人人做人人爽| 吞精囗交69激情欧美| 天堂网在线| 潍坊市| 十分钟日本在线观看视频| 亚洲av中文无码乱人伦在线r▽| 青青青国产在线视频在线观看| 田东县| 中文字幕 人妻 日韩 在线| 色哟哟国产| 久久久av| 99rαv少妇裸体高潮av| brazzers欧美丝袜秘书| 精品久久久久久精品| 河西区| 和朋友换娶妻野外夫妇3| 成年美女黄网站色大片不卡| 成人午夜精品无码区久久| 国产精品无码av在线播放| 国产又色又爽又黄刺激视频| 午夜无码无遮挡在线视频| 久久精品国产精品亚洲色婷婷| 久久国产精品张柏芝| 国产成人精品亚洲精品| 亚洲Va无码手机在线电影| 欧美丰满熟妇XXXX性ppX人交|