歡迎訪問山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊
行業(yè)資訊

冷再生機(jī)如何進(jìn)行銑刨及拌和的工作?
來源:http:/// 日期:2023-04-14
冷再生機(jī)是一種機(jī)械組合,在冷再生機(jī)的前方連接著水車,在冷再生機(jī)重要的工作過程中提供水,水罐車的體積應(yīng)該在12噸以上,這樣可以減少停車和供水的數(shù)量。好使用兩輛消防車輪流,縮短加水時間,防止水泥失效。在施工段的起始點(diǎn)后,再次檢查連接部位是否牢固,以防止事故發(fā)生。檢查水管、開關(guān)和其他部件的泄漏情況,防止水泥漿的泄漏。
The cold regeneration machine is a mechanical combination, connected to a water truck in front of the cold regeneration machine, which provides water supply during the important working process of the cold regeneration machine. The volume of the water tank truck should be more than 12 tons, which can reduce the amount of parking and water supply. Take turns using two fire trucks to shorten the water filling time and prevent cement failure. After the starting point of the construction section, check again whether the connecting parts are secure to prevent accidents from occurring. Check for leaks in water pipes, switches, and other components to prevent leakage of cement slurry.
冷再生機(jī)租賃廠家提醒您,在之前各項(xiàng)準(zhǔn)備工作結(jié)束后,冷再生機(jī)進(jìn)行銑刨。冷再生機(jī)行走速度控制在5~8m/min。銑刨過后應(yīng)立即檢查以下項(xiàng)目:銑刨厚度。
The manufacturer of the cold recycling machine reminds you that after the previous preparation work is completed, the cold recycling machine will be milled and planed. The walking speed of the cold regeneration machine is controlled at 5-8m/min. After milling, the following items should be checked immediately: milling thickness.
冷再生機(jī)租賃
人工將銑刨過的集料挖開量取松鋪厚度,松鋪系數(shù)一般為1.4,根據(jù)結(jié)構(gòu)層厚度計(jì)算松鋪厚度,及時調(diào)整銑刨厚度;集料級配。
The manually excavated amount of milled aggregate is taken as the loose paving thickness, with a loose paving coefficient of generally 1.4. The loose paving thickness is calculated based on the thickness of the structural layer, and the milling thickness is adjusted in a timely manner; Aggregate grading.
冷再生機(jī)行走速度會影響集料級配,太快或太慢都會產(chǎn)生集料離析現(xiàn)象。一般情況下都會出現(xiàn)結(jié)構(gòu)層上部細(xì)集料較多,下部粗集料較多的現(xiàn)象。出現(xiàn)這種情況時要及時調(diào)整行走速度,隨時觀察集料變化,終確定行走速度。
The walking speed of the cold recycling machine will affect the aggregate grading, and either too fast or too slow will cause aggregate segregation. In general, there is a phenomenon where there is more fine aggregate in the upper part of the structural layer and more coarse aggregate in the lower part. When this situation occurs, it is necessary to adjust the walking speed in a timely manner, observe changes in the aggregate at any time, and finally determine the walking speed.
冷再生機(jī)型號不同,出現(xiàn)離析的現(xiàn)象也各不相同,在施工過程中要區(qū)別對待;集料含水量。集料含水量是影響壓實(shí)效果的關(guān)鍵因素,在施工中要將含水量控制在佳含水量。
The phenomenon of segregation varies depending on the model of the cold regeneration machine, and should be treated differently during the construction process; Aggregate moisture content. The moisture content of aggregates is a key factor affecting the compaction effect, and it should be controlled at the optimal moisture content during construction.
在冷再生機(jī)銑刨過后要立即進(jìn)行現(xiàn)場試驗(yàn),測定集料的含水量,根據(jù)測得的含水量調(diào)整冷再生機(jī)用水量,一般應(yīng)比佳含水量大1%,待整平后含水量接近佳含水量;水泥劑量。
After the cold recycling machine is milled, on-site tests should be conducted immediately to determine the moisture content of the aggregate. The water consumption of the cold recycling machine should be adjusted based on the measured moisture content, which should generally be 1% higher than the optimal moisture content. After leveling, the moisture content should approach the optimal moisture content; Cement dosage.
水泥劑量根據(jù)配合比中的水泥用量計(jì)算出每平方米的用量后事先撒布在路面上,一般不會有太大誤差。但在銑刨過后還是應(yīng)該測定水泥劑量,確保水泥用量準(zhǔn)確無誤。由于現(xiàn)場施工中受各種因素影響,底基層的強(qiáng)度會比試驗(yàn)室強(qiáng)度有所下降,施工中水泥劑量應(yīng)比配合比高1%。
The cement dosage is calculated based on the cement dosage in the mix proportion and distributed on the road surface in advance, generally without significant error. But after milling, the cement dosage should still be measured to ensure that the cement dosage is accurate and accurate. Due to various factors affecting on-site construction, the strength of the subbase will decrease compared to the strength of the laboratory, and the cement dosage during construction should be 1% higher than the mix ratio.
冷再生機(jī)進(jìn)行銑刨及拌和的工作時要了解到的內(nèi)容就是以上所講了,希望能夠給您幫助吧,更多事項(xiàng)就來我們網(wǎng)站http://進(jìn)行咨詢了解吧!
The content that needs to be understood during the milling and mixing work of the cold recycling machine is as mentioned above. We hope it can help you. For more information, please visit our website http:// Consult and learn more!
  • 上一條:水泥撒布車需要更換的主要部件
  • 下一條:水泥撒布車和冷再生機(jī)在道路施工過程中的應(yīng)用
  • 相關(guān)產(chǎn)品:

    三级a做爰全过程在线观看| 亚洲精品国产精品国自产观看| 日韩一区二区三区在线| 91九色人妻| 青青操久久| 熟妇xxx| 亚洲精品黄片| 黄片久久| 久久密| 狠狠躁狠狠躁| 大学生一级一片全黄| 日本精品久久久| A级毛片在线观看| 99久久国产综合精品成人影院| 超H公用妓女精便器系列小说| 亚洲精品成人久久久| 国产精品免费久久久久电影| 亚洲国产精品久久久久制服| 亚洲人成人77777网站| 亚洲国产成人精品无码区宅男?| 美丽人妻在夫前被黑人| 亚洲爽图| a级人体| 97超碰在线| 国产熟女一区| 天天色天天日| 久碰| 泸州市| 国外精产品w灬源码1688| 国产人成无码视频在线观看| 亚洲区精品区日韩区综合区| av网址| 公务员艳妇熟女乱| 色精品| 人人鲁人人莫人人爱精品 | 久久久精品日韩免费观看| 国产欧美精品一区二区三区-老狼 亚洲AV鲁丝一区二区三区黄 | 乱子伦一区二区三区| 野花香在线观看视频| 隔着超薄肉丝袜做av在线| 国产成人精品一区二区秒拍|